Sign In | Join Free | My bushorchimp.com
China Hebei Yusen Metal Wire Mesh CO.,Ltd. logo
Hebei Yusen Metal Wire Mesh CO.,Ltd.
Steel Fiber For A Better Life.
Site Member

5 Years

Home > Concrete Steel Fiber >

Endhooked Concrete Steel Fiber in Hydro Power Station for Reinforcement

Hebei Yusen Metal Wire Mesh CO.,Ltd.
Contact Now

Endhooked Concrete Steel Fiber in Hydro Power Station for Reinforcement

  • 1
  • 2

Brand Name : Yusen

Model Number : YS-50/30

Certification : ISO CE

Place of Origin : China

MOQ : 1T

Payment Terms : L/C, T/T, Western Union, MoneyGram

Supply Ability : 2000T/m

Delivery Time : 10Days

Packaging Details : Pallet

Product name : Endhooked Concrete Steel Fiber in Hydro Power Station for Reinforcement

Material : Q235

TS : 1215Mpa

Color : Grey and bright

Applicant : Concrete support

Diameter : 0.6mm

Standard : ASTM 820 / CE

Style : Morden

Contact Now

Endhooked Concrete Steel Fiber in Hydro Power Station for Reinforcement


Concrete Steel Fiber introduction

Concrete steel fiber is manufactured by high quality wire rod with 6.5mm, which has excellent mechanical properties including high tensile strength. Hence, the average tensile strength of the reinforced fibre surpasses 1350MPa. Due to this high strength,the uniform distribution of fibers, stresses can be fully dispersed and cracking be effectively controlled.

Refers to loose steel fiber and glued steel fiber.the big difference between loose and glued fibers is that the former is easy to block together and the latter is easy to disperse uniformly.

Specification of Concrete Steel Fiber

Hooked Ends
Steel Fiber
Model Diameter (mm) Length (mm) Aspect ratio (mm) Tensile strength (MPa)
YS-60/60 1 60 60 ≥1000
YS-50/50 1 50 50 ≥1000
YS-65/60 0.9 60 65 ≥1000
YS-55/50 0.9 50 55 ≥1000
YS-80/60 0.75 60 80 ≥1000
YS-45/35 0.75 35 45 ≥1000
YS-50/30 0.6 30 50 ≥1100
YS-55/30 0.55 30 55 ≥1100
YS-65/35 0.53 35 65 ≥1100
YS-60/30 0.5 30 60 ≥1100
YS-50/25 0.5 25 50 ≥1100
YS-60/25 0.4 25 60 ≥1100


Application:

  1. Shotcrete, tunnel linings.
  2. Mass concrete composite deck construction.
  3. Precast concrete.
  4. Industrial slabs on ground
  5. High-speed railway
  6. Hydro power station
  7. Military project
  8. Aircraft runway

Dosing and mixing

  • Introduce fibers with sand and aggregates.
  • Add fibers to fresh concrete
  • Mixing it with mixtures for 1-2 minutes and then water to stir

Products and delivery

Endhooked Concrete Steel Fiber in Hydro Power Station for Reinforcement


Endhooked Concrete Steel Fiber in Hydro Power Station for ReinforcementEndhooked Concrete Steel Fiber in Hydro Power Station for Reinforcement



Buy cheap Endhooked Concrete Steel Fiber in Hydro Power Station for Reinforcement product

Endhooked Concrete Steel Fiber in Hydro Power Station for Reinforcement Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Hebei Yusen Metal Wire Mesh CO.,Ltd.
*Subject:
*Message:
Characters Remaining: (0/3000)